Now reading: Scottsdale Kitchen Remodeling: Designing for Cooking From Scratch Every Day
Kitchen remodeling for Scottsdale condos and lofts, planned around the building first. (480) 379-3060

Condo and Loft Kitchens, Old Town Scottsdale

A Kitchen Remodel That Gets Past the Board and the Concrete

In a condo or loft, the kitchen you want is shaped by a concrete ceiling you cannot cut into, a riser you share with your neighbors and an alteration agreement you have to sign first. We plan around all three before we draw a single cabinet.

Board packages prepared for youConcrete scanned before any drillingSlabs measured against your elevator
Remodeled kitchen with white shaker cabinets, a charcoal quartz island, patterned tile backsplash and stainless appliances

Notes From Concrete Buildings

What we have learned remodeling kitchens in buildings with shared walls, shared risers and a board to answer to.

November 8th, 2026

Scottsdale Kitchen Remodeling: Designing for Cooking From Scratch Every Day

Gingerbread, christmas, advent in Scottsdale, AZ

A household that cooks dinner from raw ingredients six nights a week uses a kitchen differently from one that assembles dinner. The difference is not skill and it is not equipment. It is the sheer volume of produce that passes through the room, and volume of produce is a storage problem, a water problem, a counter problem and an air quality problem long before it becomes a cooking problem.

Most kitchens, including expensive ones, are drawn around the range and the island. The range gets perhaps forty minutes of real use a day. The board where a head of cabbage gets broken down, where three pounds of carrots get peeled and where a chicken gets jointed is in use far longer than that, standing up, with a colander, a bowl for trim, a wet bin and a knife all competing for the same square foot of surface. When that square foot does not exist, the cooking still happens, it just happens badly, with the dish rack pushed aside and the fruit bowl relocated to a chair.

The brief for a scratch cooking kitchen is unusual enough that it rarely survives a showroom conversation. A phone search like kitchen remodeling near you near me returns a list of firms who will all ask about door styles and slab selection, and very few who will ask how many pounds of vegetables come through the room in a week. The answer changes the floor plan. It is worth saying out loud at the first design meeting, because the fixes are mostly dimensions and positions, and a dimension is free while it is still a number on a drawing.

Scottsdale makes the case stronger than most places. The outdoor markets run most of the year here rather than for three months, so households that cook tend to buy produce in volume and buy it fresh. Then the long summer pushes everything indoors, so the room doing that work is also the room nobody wants to add heat to from May through September. And a great many houses in this part of the valley were built resort style, with an enormous island meant for entertaining and almost no dedicated prep counter anywhere in the plan.

A prep zone, not a corner of the island

The single highest return item for a daily cook is a second small sink with real counter beside it, placed out of the main traffic path. It does not need to be large. A bowl around fifteen inches across with a single tap is plenty, and the thing that makes it useful is a colander or a strainer basket that actually fits the bowl, so rinsing and draining happen in one place instead of migrating to the main sink and blocking it.

Beside that sink, ask for a clear run of counter of at least three feet with nothing on it. No soap dispenser, no appliance garage, no decorative tray. The whole value of the zone is that it is empty when you walk up to it. Directly below, a deep drawer sized for boards standing on edge means the board comes out in one motion rather than being wrestled from behind a stack of baking dishes. A pull out caddy for compost and vegetable trim in the same cabinet saves the twenty trips a day that otherwise go to the bin across the room.

The island is tempting for this and usually wrong. An island is a thoroughfare, a homework desk and a place people set their drinks. A cook who wants a board down for an hour needs somewhere that does not get cleared for anything else.

Produce storage that is not the refrigerator

Scratch cooking produces a steady inventory of food that a refrigerator actively damages. Onions, garlic, shallots, potatoes, sweet potatoes, winter squash, tomatoes and most stone fruit all do better cool, dark and ventilated than cold and sealed. Refrigerate a tomato and the texture is gone. Refrigerate potatoes and the starch turns sweet. In a room where that food arrives weekly in quantity, it needs an address.

Three pieces of storage cover it. A ventilated drawer or basket run in a base cabinet on an interior wall, away from the dishwasher and well away from the oven, for onions and roots. Wire or wicker baskets rather than solid boxes, because air movement is the whole point and anything that sweats will rot from the bottom. A pantry basket at a height you can see into, so nothing is forgotten at the back. And one bowl or raised rack on the counter for whatever is ripening this week.

That last one is worth a sentence of its own. Fruit left directly on a stone counter sits on a surface that stays notably cooler than the room, and a bunch of bananas or a pile of peaches resting on cold quartz will mark and sweat where it touches. A raised bowl, a wire stand or a hook with air moving under it solves it for almost nothing.

Induction, and the air you cook in

A gas burner is a combustion appliance operating in the middle of a room where people breathe. Burning gas produces nitrogen dioxide, carbon monoxide and fine particles, and anyone who has stood over a wok on a high flame has smelled the result. For a household that cooks for twenty minutes a day, it is a modest exposure. For one running burners for an hour and a half every evening, with children at the island, it is the same exposure repeated daily for years.

Induction removes the source rather than managing it. There is no flame and no combustion, so the only thing the ventilation has to deal with is grease, steam and cooking odour, which is a smaller job than removing the products of burning fuel as well. A hood still earns its place over an induction cooktop, and that is its own conversation with its own numbers.

The practical arguments mostly favour induction too for this kind of cooking. Water boils faster, which matters when you boil water several times a day. The surface puts far less waste heat into the room, which in a Scottsdale summer is heat the air conditioning does not have to remove again. Simmering is genuinely steadier at low settings. The honest trade offs are cookware and electrical capacity. A magnet that sticks firmly to the base of a pan means that pan will work, and anything aluminium, copper or glass will not. On the electrical side, a full width induction cooktop wants a substantial dedicated circuit, so put that question to whoever is pricing the job early rather than discovering it when the old range comes out.

A steam oven as the second oven

If the budget allows one appliance beyond the ordinary, a steam oven or a combination steam oven does more for daily cooking than a second conventional oven does. Reheating leftover rice or roast vegetables with steam brings them back rather than drying them out, which is the difference between batch cooking being useful and batch cooking being a chore nobody eats. Vegetables steam without being watery, bread crusts come out properly and a combi unit roasts as well.

Two installation points matter. A plumbed unit never needs its reservoir filled and is the better long term choice, but it needs a water supply and a drain in that cabinet bay, which is cheap to add during the remodel and awkward afterwards. And steam appliances need descaling on a schedule in water as hard as the valley's, so put it where the filter and the service panel are reachable without emptying a cabinet.

The sheet pan station

Batch cooking runs on sheet pans, and sheet pans need two things the average kitchen does not provide. The first is landing space. Two half sheet pans sitting side by side need roughly three feet of counter, and that counter should be immediately beside the oven rather than across an aisle, because a loaded pan of hot vegetables is not something to carry past a dog and a toddler.

The second is oven height. A wall oven with its floor set between the height of your hip and your lowest rib lets you slide a heavy pan in and out level, with your eyes above the opening. A range oven at floor level makes the same move a squat and a lift, and a wall oven mounted too high puts your forearms under a shelf of hot steam. If there is one measurement to insist on in the cabinet schedule, it is that one. Add a tall narrow cabinet with vertical dividers so pans, racks and trays store on edge, and the stack that sticks and clatters disappears.

Bulk dry goods, and the bins they live in

Buying flour, rice, beans, oats and lentils in bulk is standard for anyone cooking daily, and the storage mistake is to plan around the bag rather than the container. Decant into square or rectangular airtight bins, because round canisters waste a third of the shelf between them. Then measure the bins you intend to buy and give the cabinet maker those numbers, since shelf spacing drawn at a generic height means stacking bins in a way that buries the bottom one.

Keep the bins that get opened daily within arm's reach of the prep zone and the rest wherever is convenient. A scoop that lives in each bin, and a label with the date it was filled, is the part that keeps the system alive after the first month.

Cabinet cores and finishes

A kitchen is a large volume of manufactured wood panel installed in an enclosed room, and what those panels are bonded with is a fair question to ask. Conventional particleboard and MDF cores are commonly made with urea formaldehyde resins that release formaldehyde into the air, most heavily when the material is new. Panels made with no added formaldehyde resins, and plywood cores bonded with phenolic resin, do not behave the same way.

Four questions get you most of the way. What are the boxes and the door cores made from, and are they certified as no added formaldehyde or ultra low emitting. Is the finish water based or solvent based, and what is its volatile organic compound content. Are the interiors of the boxes sealed, since an unfinished edge emits more than a finished one. And can the cabinets sit in a ventilated space for a week or two before installation. None of that costs much when it is specified up front, and a supplier who can answer all four in a sentence each has thought about it before.

Light at the board, and room for two

Put the prep zone where the daylight is if the plan allows it, which usually means under or beside a window. Judging whether a piece of fish is cooked or a herb has wilted is a colour task, and overhead lighting alone puts your own shadow on the board. One task light aimed at the work surface from the front edge of the upper cabinet, with good colour rendering, fixes the shadow for the price of a fixture.

Then decide whether two people cook here at the same time, because that answer sets the aisles. Two cooks passing behind each other want about four feet of clear floor rather than the three feet a single cook tolerates, and they want two water sources and two bins, or one of them spends the evening waiting. They also want the refrigerator positioned so it can be opened by somebody who is not cooking without crossing the hot zone at all. Those are plan decisions, settled on paper in an afternoon, and no amount of finish budget buys them back later.

September 13th, 2026

An Old Town Scottsdale Condo Kitchen Remodel, Week by Week

An Old Town Scottsdale Condo Kitchen Remodel, Week by Week

Owners of condos and lofts in Old Town Scottsdale usually ask us the same first question, and it is rarely about cabinets. They want to know what the next few months will actually look like. How long before anything happens. When the noise starts. Whether they can stay in the unit. What the neighbors will put up with.

A remodel in a shared building has a rhythm that a house does not. There is a long quiet stretch at the start where the real work is paper and measuring, then a short burst of loud days, then a longer stretch of careful, quieter work that depends on other people showing up in the right order. Knowing that rhythm in advance takes most of the stress out of it.

What follows is how a typical same layout kitchen remodel runs in a concrete condo or loft building, from the first walkthrough to the day the building manager releases the damage deposit. Every building has its own rules, so treat this as the general shape, not a promise about yours.

Before Week One: The Part Nobody Sees

The work starts long before a cabinet comes off the wall, and the earlier weeks set the pace for everything that follows.

Reading the alteration agreement

Most associations have a document that governs remodeling. Some call it an alteration agreement, some a remodeling policy, some bury it in the rules and regulations. It tends to cover the same ground: which work needs approval, what hours noisy work is allowed, whether contractors can use the passenger elevator, where debris goes, what insurance is required and whether a deposit is held against damage to the common areas.

We read it with the owner at the first visit. It is the single most useful document in the whole project, and it answers a lot of design questions before they are asked. If the agreement says flooring must carry a sound control underlayment, that changes the floor build up and possibly the cabinet toe kick height. If it says no work on weekends, that stretches the calendar.

Learning the building’s bones

At the same visit we look for the things that decide what is possible:

  • The ceiling. Is it a bare concrete slab, a slab with a dropped drywall ceiling below it, or a wood framed assembly? A bare slab rules out cutting in recessed lights.
  • The riser. Where do the drain and supply lines run up through the building, and where is the shutoff for the unit? In many buildings, the shutoff for a kitchen is shared with a neighbor.
  • The exhaust path. Is there an existing duct to the outside, and does it actually reach an exterior wall, or does it stop in a chase?
  • The electrical panel. How much capacity is there, and is there room for a dedicated circuit for an induction cooktop or a second oven?
  • The route in. Lobby door width, the elevator cab’s depth and diagonal, the hallway turn and the unit’s own entry door.

That last one surprises people. A countertop run or a tall pantry cabinet that cannot make the turn out of the elevator is a design problem, and it is far cheaper to solve on paper.

Design inside the limits

With those facts in hand, the design conversation gets much more honest. A loft owner who wants a big island sink learns early whether the drain can reach the stack without coring through the slab. Someone who wants a powerful gas range hood learns whether there is anywhere for the air to go. Often the answer shapes the kitchen for the better: an induction cooktop paired with a good recirculating hood, a sink kept on the plumbing wall, and the savings spent on plywood cabinet boxes, full extension drawers and a counter surface that shrugs off Scottsdale’s hard water.

Weeks One Through Four: Approval and Ordering

Once the design is settled, two clocks start at the same time.

The first is the association. We prepare the package the board or its architectural committee asks for, which usually includes a written scope of work, a simple plan, product sheets, a certificate of insurance naming the association and a proposed schedule. Review time depends on how often the committee meets. Some buildings turn a package around in a week or two. Others meet monthly and will send it back with questions.

The second clock is the materials. Cabinets are almost always the longest lead item. Semi custom lines commonly take several weeks to arrive, and custom cabinetry can take longer. We place the order once the association has approved the layout, not before, because a board condition that moves an appliance or changes the flooring can change the cabinet order too.

This is also when the City of Scottsdale permit question gets answered. A kitchen that keeps its plumbing and electrical where they are and only replaces cabinets and counters may not need one. Adding circuits, moving a sink or changing a wall usually does. The association’s approval and the city’s permit are two separate things, and neither substitutes for the other. When a permit is needed, we submit the plans and wait for it before scheduling any work it covers.

What the owner does during this stretch

Not much, which is the point. The useful things are to clear out the cabinets you are not using, decide where you will set up a temporary kitchen, and let the property manager know your rough timing so they can warn the neighbors who share your walls.

Week Five: Protection and Demolition

Demolition day in a condo begins in the hallway, not the kitchen.

We book the elevator for the hours the building allows, hang pads in the cab, lay protection down the corridor from the elevator to the unit door and put a walk off mat at the entry. Inside, we seal off the rest of the unit with plastic and a zipper door, cover floors that are staying, and set up a place for the debris that keeps it out of the common areas until it can go down in the elevator.

Then the kitchen comes out. Upper cabinets first, then the countertop, then the base cabinets. The building engineer or a plumber shuts the water, and we cap the supply lines and plug the drain so nothing runs into the stack while it is open.

In a concrete building, demolition is louder than people expect, because sound travels through the structure. We keep the noisy work, like breaking out old tile or cutting, inside the hours the rules allow and group it into as few days as possible. Most of the loud part of a same layout remodel is over within a few days.

What demolition often turns up

Opening a condo kitchen tends to reveal one or two surprises. A slow leak under the old sink that has stained the subfloor. A junction box buried behind a cabinet with no cover. A dishwasher drain with no air gap or high loop. None of these are unusual in older buildings, and none of them are dramatic, but each one gets fixed properly before new work covers it up. We would rather call the owner about a forty dollar part than close a wall over a problem.

Weeks Five and Six: Scanning and Rough In

This is where a concrete building behaves most differently from a house.

Scanning before any penetration

If anything has to go into the concrete, whether an anchor for a heavy wall cabinet, a new conduit path or a sleeve for a duct, the area is scanned first. A scanning technician uses ground penetrating radar to locate rebar and, in post tensioned slabs, the steel tendons that run through the concrete under very high tension. Those locations are marked on the surface, and the penetration is placed where the scan shows it is clear.

Post tensioned construction is common in mid rise and loft buildings, and there is no way to tell from inside a unit where the tendons are. Drilling on a guess is how a small kitchen job becomes a structural repair and an insurance claim for the association. Many buildings require scanning in writing, and we do it whether they require it or not.

Plumbing and electrical rough in

With the walls open, the plumber sets up supply and drain connections for the new sink, dishwasher and any refrigerator water line. In a same layout remodel, the drain stays close to the riser, which keeps this step short and keeps the water outage for neighbors to an hour or two.

The electrician runs the circuits the new kitchen needs. Current codes expect dedicated circuits for appliances like the dishwasher, disposal, microwave and refrigerator, along with GFCI protection for countertop receptacles and AFCI protection where required. An induction cooktop may need a larger circuit, which is why we checked the panel back at the first visit. Under cabinet lighting gets its wiring now too, since it is very hard to add neatly after the cabinets are hung.

Inspection

When a permit is involved, a city inspector looks at the rough work before walls are closed. We schedule this so that nothing is covered up ahead of time. Some associations also want their building engineer to look at plumbing connections before they are hidden, and we coordinate both visits.

Weeks Six and Seven: Walls, Floors and Cabinets

After inspection, walls are patched and the floor gets whatever it needs. If the association requires a sound control underlayment beneath a new hard floor, it goes down here, and the finished floor typically runs under where the cabinets will sit so they can be removed later without leaving a gap.

Cabinets come up in the elevator during a booked window, with the corridor protection still in place. Base cabinets go in first and get leveled carefully, because a countertop can only be as flat as the boxes beneath it. Concrete floors in older buildings are rarely perfectly level, so shimming is normal. Upper cabinets follow, fastened into the wall structure, with anchors placed where the scan cleared them if they go into concrete.

This is the week the room starts to look like a kitchen again, and it is also a quieter stretch. Assembling and hanging cabinets is mostly measuring, screwing and adjusting, not the sort of noise that brings a call from the unit below.

Weeks Seven and Eight: Template, Fabrication and Counters

Once the base cabinets are set and level, the countertop fabricator comes to template. They create an exact pattern of the tops, including the sink and cooktop cutouts and the seam locations.

In a condo, the seam locations are not purely a design choice. They are decided partly by what the elevator and hallway can carry. We settled most of that during design, but the template visit confirms it against the real cabinets. If a long seamless run is important, sometimes a freight elevator booking or a stair carry makes it possible. Sometimes the right answer is a seam placed where it will be least noticeable, such as at the sink.

Fabrication usually takes a week or two after template. Install day is short but busy: slabs come up in the elevator, get set and seamed, and the sink is mounted. A plumber comes back afterward to reconnect the sink, faucet, disposal and dishwasher.

Choosing a surface for hard water

Scottsdale’s municipal water is very hard, and whatever you choose will see mineral spots near the sink. Quartz and porcelain slab clean easily without sealing. Granite and quartzite handle it well once sealed. Marble is the one to think carefully about, because the acidic cleaners that remove scale will etch it. An undermount sink avoids the rim where scale likes to collect.

Week Eight and Beyond: Backsplash, Finish and Handover

After the counters are in, the backsplash tile goes up and is grouted. Then the finish work: cabinet hardware, adjusting doors and drawers so the gaps are even, installing under cabinet lights, setting appliances, fitting the hood and its filters, caulking where the counter meets the wall and touching up paint.

We then take the corridor and elevator protection down, clean the common areas, and walk the building with the property manager. That walk matters, because it is usually what releases the owner’s deposit. Any scuff we caused gets fixed before we leave, not argued about.

The final step is a walkthrough with the owner, drawer by drawer, and a short punch list for anything that needs another visit. When a permit was involved, the final city inspection happens here as well.

Living in the Unit While It Happens

Most of our condo owners stay in their homes during the remodel, and it is manageable with a little setup.

  • A temporary kitchen. A folding table in another room with a microwave, an electric kettle, a toaster oven or a single induction burner, and the refrigerator moved and plugged in nearby.
  • A dish plan. A bathroom sink works for light rinsing. Paper plates for the loudest week are not a failure of character.
  • Dust control. The sealed zipper door and negative air help, but plan to keep bedroom doors closed during demolition.
  • Pets. The noisy days are hard on animals. Many owners board them or have them stay with a friend for demolition week.
  • Deliveries. Cabinets and slabs arrive during booked elevator windows, so you do not need to be home for each one if we have access arranged with the building.

Summer in Scottsdale adds one more consideration. With temperatures well above 100 degrees for months, the unit’s air conditioning runs constantly. Keeping the work zone sealed stops construction dust from ending up in the return air and the filter. We change or cover the return grilles during dusty work for that reason.

Where the Schedule Usually Stretches

Honest schedules name the things that slow them down. In condo work, those are almost always outside the kitchen itself:

  • Association review that meets monthly or asks for revisions.
  • Cabinet lead times that land longer than the manufacturer first quoted.
  • Elevator availability when another unit in the building has booked the same days.
  • Restricted working hours that turn a two day task into three.
  • Inspection scheduling, which depends on the city’s calendar rather than ours.

We build slack for these into the plan from the start, so the dates we give are dates we can keep.

When a Smaller Project Makes More Sense

Not every Old Town kitchen needs the full sequence. If the cabinet boxes are sound, square and dry, and the layout works for the way you cook, replacing only the countertops, sink and backsplash can transform the room in a fraction of the time. That job typically means one template visit, a wait for fabrication, and a day or two without a sink. It also needs far less from the association in most buildings.

Refacing is another middle path. New doors, drawer fronts and hardware on existing boxes, paired with new counters, gives much of the look of a new kitchen with very little demolition noise. It is a poor choice if the boxes are swollen, sagging or poorly laid out, and a good one if they are solid.

We will tell you which of those fits your unit, even when it is the smaller job.

Getting Started

The most useful thing to have ready for a first conversation is your building’s alteration rules and the name of your property manager. With those two things, we can usually tell you on the first call what is realistic in your building and how long it is likely to take. Call Primalhealthwithjean at (480) 379-3060 to set up a walkthrough at a time your building allows.

Primalhealthwithjean remodels kitchens in Scottsdale condos, lofts and townhome buildings, and most of our work sits within a short drive of Old Town. A kitchen in a concrete building is a different job from a kitchen in a stucco ranch house. The walls you want to open may carry pipes for the unit above. The ceiling is often a structural slab, sometimes post tensioned, which means nobody should drill into it on a guess. And before a single cabinet comes out, the association usually wants drawings, an insurance certificate naming the building, a schedule and a deposit held against damage to the common areas.

None of that is a reason to settle for a dated kitchen. It is a reason to plan in the right order. We start with the building, not the showroom. We read your alteration agreement, ask the manager which hours are allowed for noisy work, find out whether there is a freight elevator or a padded passenger car, and learn where the plumbing riser and the water shut off actually are. Then we design a kitchen that works inside those limits, so the plan you fall in love with is one the board can approve and the building can physically take.

The practical questions come up in every unit. Can the range hood vent outside, or does it have to recirculate? Can the sink move to the island, or does the drain need to stay near the stack? Will a nine foot quartz slab fit in the elevator, or does the run need a seam? We answer those early, in writing, and we tell you plainly when a change costs more than it is worth. Sometimes the smartest move in a loft is to keep the plumbing wall where it is and spend the money on cabinets and counters you touch every day.

  • The ceiling decides the lightingA concrete ceiling rules out cutting in recessed cans. Surface fixtures, track, pendants on existing boxes or a shallow dropped soffit give you good light without touching the slab.
  • The riser decides the sinkDrains in a stacked building run to a shared vertical line. Keeping the sink on or near that wall is usually the difference between a simple job and a floor that has to be opened.
  • The elevator decides the slabCountertop runs are sized to what fits through the lobby, the cab and the hallway turn. Measuring that first avoids a seam decided on install day.
  • What a Condo Kitchen Costs Under Concrete

    Condo work carries costs a house does not: board paperwork, elevator bookings, corridor protection, scanning and tighter working hours. These ranges include those, and the biggest swing is whether plumbing or ventilation moves.

    Countertops and Fixtures$5,500 to $13,000
    • New slab on existing cabinets
    • Sink, faucet and backsplash
    • Usually one or two days of noise
    Ask about your counters
    Full Kitchen, Same Layout$38,000 to $72,000
    • New cabinets, counters and lighting
    • Plumbing stays on its wall
    • Board package included
    Plan a same layout remodel
    Loft Kitchen, Services Moved$70,000 and up
    • Sink or range relocated
    • Scanning, engineering and new ducting
    • Longer approval and permit time
    Talk through the layout

    Kitchen Work Inside Old Town Condos and Lofts

    Every service here is built around the rules and the structure of a shared building, not a detached house.

    Board and Alteration Packages

    We prepare the scope letter, simple plan drawings, product specifications, the certificate of insurance your association asks for and a work calendar that respects its quiet hours, so the approval arrives before demolition day instead of after it.

    Concrete Scanning Before Any Drilling

    When an anchor, a conduit run or a duct has to pass into concrete, the area is scanned first by a scanning technician. Post tensioned slabs hold steel cables under enormous tension, and hitting one is a structural and financial problem nobody wants.

    Lighting Without Cutting the Ceiling

    Under cabinet LED strips, surface mounted fixtures, low profile track and pendants fed from existing boxes. Where the design calls for recessed light, we build a shallow soffit or ceiling cloud and light from inside it.

    Ventilation That Suits the Building

    If your unit has a real exterior duct path, we use it and size the hood to the cooktop. If it does not, we specify a recirculating hood with proper charcoal filtration and often pair it with an induction cooktop, which puts far less heat and grease into the air.

    Countertop Replacement

    Old tops out and new quartz, quartzite, granite or porcelain slab in, with every slab length checked against the elevator cab and hallway before fabrication. A sensible choice for condos whose cabinet boxes are still sound.

    Cabinets on Shared Plumbing Walls

    Full cabinet replacement with the building engineer booked to shut the riser, flooring protected in the corridor and the sink kept close to the stack so no neighbor loses water for longer than an hour or two.

    Board Approval, Elevators and Concrete: What Owners Ask

    Do I need my association's approval to remodel a condo kitchen?
    In most Scottsdale condo and loft buildings, yes. The governing documents usually require written approval for anything beyond paint and appliances, especially work that touches plumbing, electrical, flooring or walls. Approval often comes with conditions such as working hours, a refundable deposit and proof of insurance. We read the agreement with you and prepare the package the board wants to see.
    Can I put recessed lights in a concrete ceiling?
    Not by cutting into the slab. Concrete ceilings in many buildings are structural, and some are post tensioned with steel cables running through them. Good kitchen light is still very achievable with under cabinet strips, surface fixtures, pendants and track, or with a shallow dropped soffit over the cabinets that gives recessed fixtures somewhere safe to sit.
    Will my range hood be able to vent outside?
    It depends entirely on whether the building gives you an exterior path. Some units already have a duct to an outside wall. Many do not, and cutting a new penetration through a concrete wall or a rated assembly is rarely allowed. When outside venting is off the table, a recirculating hood with good charcoal filters and an induction cooktop is the honest best option.
    Can I move the sink to an island?
    Sometimes. A sink needs a drain with enough slope, and in a stacked building that drain has to reach the shared line. If the floor is a concrete slab, running a drain across the room may mean coring through it, which requires scanning and very often association and engineer involvement. We price both versions so you can see what the move actually costs.
    How long will I be without a kitchen?
    For a same layout remodel, plan on roughly five to eight weeks of disruption once work starts, with cabinet and slab lead times sitting in front of that. Condo rules that limit noisy hours stretch the schedule compared with a house. A counters only replacement is usually a day or two without a sink. We set up a temporary counter and hot plate area if you are staying in the unit.
    Is refacing cabinets worth it in an older condo?
    If the boxes are solid plywood or sound particleboard, square and not water damaged, refacing with new doors, drawer fronts and hardware can give you most of the look for less money and far less noise. If the sink base has swelled, the layout does not work or the boxes are a thin builder grade that has sagged, replacing them is the better spend.
    What countertop holds up best to Scottsdale's hard water?
    Hard water leaves mineral spots on every surface, so the question is how easily they clean off. Quartz and porcelain slab wipe clean without sealing. Polished granite and quartzite do well once sealed. Marble is the one to be careful with, because the acidic cleaners people use on scale will etch it. Lighter, lightly patterned colors hide spotting better than solid dark tops.
    Do I need a City of Scottsdale permit as well as board approval?
    They are separate things. The association controls what happens in its building. The city controls work covered by its building codes, which typically includes moving plumbing, adding circuits or altering walls. A cosmetic swap of counters may need neither a permit nor much paperwork, while a relocated sink may need both. We confirm what your scope requires before we schedule anything.

    Buildings and Blocks Around Old Town

    Most of our kitchens are in condo, loft and townhome buildings in central and south Scottsdale.

    • Scottsdale, AZ (85250, 85251, 85254, 85257)
    • Old Town and the Arts District
    • Scottsdale Waterfront along the Arizona Canal
    • Fifth Avenue and the Civic Center blocks
    • South Scottsdale near Indian Bend Wash
    • McCormick Ranch and Gainey Ranch condo communities

    Call (480) 379-3060 and have your building name and management company handy. It tells us a lot about what the association will ask for.

    Send the Alteration Agreement Before We Measure

    The most useful thing you can do before we visit is find your association's remodeling or alteration rules and the name of your property manager. With those in hand we can tell you on the first call what is realistic in your building, what the board will want to see and where your money does the most good. Call and we will book a walkthrough at a time your building allows.